Trainz 2010:      TS 12 Route Winter Pictures Page 1 Pictures Page 2 Pictures Page 3 Pictures Page 4 Pictures Page 5 Pictures Page 6 Route Return
 

Last updated: April 23, 2013

 

An eastbound grain train climbs through the Lower Spiral Tunnel on its way to

the summit of the Kicking Horse Pass.

 

April 23, 2013

 

A potash train heads east through the Upper Spiral Tunnel.

 

April 23, 2013

 

The summit of Kicking Horse Pass (Elevation 5,339 feet).

 

April 23, 2013

 

Meet at Stephen Siding.

 

April 23, 2013

 

Heading east from Stephen Siding towards the Bow River Valley.

 

April 23, 2013